Thursday, June 3, 2021

CoV Road Crew


With the asphalt dumped and spread over the gravel-filled trench, the roller begins its compression. Here the driver moves south to north, the noon sun behind him, his machine's shadow darker than any asphalt.

Once done, there is a 2"-3" difference between the compressed asphalt and the surface of the road. Another dump of asphalt before the trench and the road are flush.

About three metres to the right was a smaller job, not a trench but a Malevich. Of course it is one thing to fill this square, quite another to cut it into the road, as a previous crew did when they adjusted the water and sewage lines. You will note that only those shadows that appear on the square are darker than those around it.



No comments:

Post a Comment